Interiors Project 01 Shower Room
So the first interiors project for me in our new house is the downstairs shower room. It's small and definitely not perfectly formed at the moment. Everything needs replacing and we'll be fitting a proper shower rather than the weak electric one that is in there now.
The first job was to take off the plasterboard boxing out of the stairs above. This will make it seem a lot more spacious. The plumber is coming in on the 20 Feb to fit a new radiator and the plumbing for the shower.
Jobs to be done:
- Replace window
- Remove electric radiator
- Remove shower, wc, basin and replace
- Remove floor tiles
- Remove wall tiles
- New column radiator
- New lighting
- New flooring
- New wall tiles
Existing Shower Room
The first job was to take off the plasterboard boxing out of the stairs above. This will make it seem a lot more spacious. The plumber is coming in on the 20 Feb to fit a new radiator and the plumbing for the shower.
Limited floor space, large basin and wc, big step
onto and into the shower... hopefully all improved soon
Existing electric radiator which is going to be removed
and the space is going to be made into one big shower
Bridesmaids Jewelry crystal jewelry groomsmen gifts Pearl Bridal Jewelry Swarovski crystal earrings
